Radyr · Cardiff · CF postcodes
Accoya Front Doors in Radyr
Accoya Front Doors for Radyr properties: a free measured survey, a fixed price, and a door that still closes cleanly in the winter.
Specifying a door for Radyr
Radyr sees a normal share of west-coast weather without the salt load of a seafront opening. Engineered stiles and a properly sealed bottom rail handle it comfortably.
Housing in and around Radyr is largely stone and rendered cottage stock, which suits ledged, braced and boarded doors with a plank face and long strap hinges. We match the mouldings and panel proportions to what is already on the street rather than fitting a generic pattern.
- Exposure
- Moderately exposed — CF postcode area
- Timber
- Engineered redwood or hardwood
- Weather detail
- a full weatherbar, drip mould and rebated cill
- Ironmongery
- Stainless or quality plated ironmongery
- Recoating
- Every five to seven years on the weather elevation
Price and lead time in Radyr
Accoya Front Doors start at £2,600 per door supplied and fitted, VAT included. Typical lead time is 8–10 weeks from survey. Use the indicative price tool for a range in about a minute.
Common questions
What makes Accoya different?
It is softwood modified through acetylation so it barely absorbs moisture. Movement drops dramatically, coatings last far longer, and it carries a long durability warranty.
What door suits a stone cottage?
A ledged, braced and boarded door with long strap hinges. Openings are usually low and rarely square, so the door is made to the opening as found.
How secure is a timber door?
A well-built timber door with a multipoint lock and reinforced keeps is at least as secure as a composite equivalent. The lock and the frame fixings matter more than the leaf material.
Do I need building regulations approval?
Replacing a door like-for-like usually does not need approval, but the new door must meet current thermal and safety-glazing standards. We specify to comply as standard.
Can you make non-standard shapes?
Arched heads, splayed jambs, tapered cills and out-of-square openings are routine. Old buildings are rarely square and we build to the opening as found.
How do I look after the finish?
Wash the door twice a year with mild soapy water and check the bottom rail and cill for standing water. Recoating intervals depend on exposure and aspect — south and west elevations go first.
Nearby
We cover the rest of Cardiff too.
Get a fixed price for Radyr
Send sizes or a photograph and we will come back with an indicative range, then survey free of charge before anything is made.