Period & heritage
Conservation Area Doors
Doors drawn to satisfy conservation officers, with drawings for planning.
Timber moves. The trick is not to stop it but to allow for it — correct moisture content at the workshop, sealed end grain, a finish that lets vapour out and keeps water off, and clearances set for the season you fit in.
What you get
- A measured survey before anything is cut, recording the opening at several heights because very few are square.
- Timber specified for the site — engineered redwood under paint, dense hardwood where strength matters, oak where the grain is the point, Accoya where exposure is severe.
- A factory finish sprayed on all six faces including top and bottom edges, then cured before the door leaves the workshop.
- Fitting and first-season adjustment, because timber settles and buildings move.
- A ten-year guarantee on the joinery and the finish.
Guide price and lead time
Conservation Area Doors start at £1,950 per door supplied and fitted, with VAT included. Typical lead time is 8–11 weeks from survey to fitting. Size, timber, glazing and ironmongery all move the number — use the indicative price tool for a range in about a minute, or send sizes for something closer.
Common questions
Will the council accept a new timber door?
Usually yes, if it matches the original pattern, mouldings and glazing. Refusals almost always follow proposals that change the appearance rather than the material.
Will a timber door swell and stick?
Timber moves with humidity, which is why clearances, sealed end grain and a breathable finish matter. A door made to the correct moisture content and finished on all six faces stays workable through the seasons.
What is engineered timber and why use it?
Engineered stiles are laminated from several sections with the grain alternated, so the door resists twisting far better than a solid section of the same size. Under paint it is the more stable choice.
Do you fit as well as supply?
Both. Most customers take supply and fit, which keeps the guarantee in one place. Supply-only is available if you have your own joiner.
What glazing goes in a timber door?
Sealed units in a range of obscure, etched, leaded and clear finishes, bedded and beaded from the inside so the glass cannot be removed from outside.
How energy efficient is a timber door?
A modern insulated timber door with a sealed unit performs comparably to composite alternatives, and timber itself is a far poorer conductor than aluminium or steel.
What finish options are there?
Factory spray in any RAL or heritage colour, translucent stains, and natural oils on oak. All applied and cured in controlled conditions before the door ships.
How it works
Tell us the opening
Send sizes, a photo or just the address. A rough idea is enough to price the job.
Free measured survey
We measure the structural opening, check the cill and reveal, and confirm the specification.
Made and finished
Your door is machined, assembled and spray-finished, then cured before it leaves the workshop.
Fitted and adjusted
Hung, ironmongery set, weatherseals checked and the door left closing properly on a cold morning.
Conservation Area Doors by county
Local pages carry specification notes for exposure, housing character and conservation status.
Get a fixed price for conservation area doors
Send sizes or a photograph and we will come back with an indicative range, then survey free of charge before anything is made.