Timber Door CompanyCrafted in wood. Built to last.

Bridge of Allan · Stirlingshire · FK postcodes

Timber Fire Doors in Bridge of Allan

Timber Fire Doors made to measure for homes across Bridge of Allan, surveyed on site and finished in the workshop before they are hung.

Specifying a door for Bridge of Allan

Bridge of Allan sees a normal share of west-coast weather without the salt load of a seafront opening. Engineered stiles and a properly sealed bottom rail handle it comfortably.

Housing in and around Bridge of Allan is largely Victorian terraced and villa stock, which suits four-panel doors with a bolection moulding and an etched or obscured upper light. We match the mouldings and panel proportions to what is already on the street rather than fitting a generic pattern.

Exposure
Moderately exposed — FK postcode area
Timber
Engineered redwood or hardwood
Weather detail
a full weatherbar, drip mould and rebated cill
Ironmongery
Stainless or quality plated ironmongery
Recoating
Every five to seven years on the weather elevation

Price and lead time in Bridge of Allan

Timber Fire Doors start at £690 per door supplied and fitted, VAT included. Typical lead time is 4–6 weeks from survey. Use the indicative price tool for a range in about a minute.

Common questions

What does FD30 actually mean?

The doorset resists fire for 30 minutes when tested as a complete assembly. The rating belongs to the doorset — leaf, frame, seals and ironmongery — not the leaf alone.

What door suits a Victorian terrace?

A four-panel door with a bolection moulding and an etched or obscured upper light. Stile widths matter — narrow modern stiles make the proportions look wrong immediately.

Can a timber door be made wheelchair accessible?

Yes. A low-threshold or ramped cill can be specified without losing the weather seal, and the leaf can be widened where the structural opening allows.

Will the colour fade?

Modern microporous coatings hold colour well, though very dark colours on south-facing elevations work hardest. We will advise if a chosen colour is likely to be a maintenance burden.

Do you work on listed buildings?

Regularly. Listed building consent is a separate process from planning, and we can supply the drawings and specification your application needs.

What happens if the door needs adjusting later?

First-season adjustment is included. Timber settles, buildings move, and a small tweak after a winter is normal rather than a fault.

Nearby

We cover the rest of Stirlingshire too.

10-year guarantee
Free measured survey
Responsibly sourced timber
Nationwide installation
Fixed price, no surprises

Get a fixed price for Bridge of Allan

Send sizes or a photograph and we will come back with an indicative range, then survey free of charge before anything is made.

Call usGet a quote