West Midlands
Timber Front Doors in West Midlands
Homes in West Midlands get Timber Front Doors built around the opening they have, with the timber and finish specified against local conditions.
Most door problems are not the door. They are an opening that has moved, a cill that sheds water backwards, or a finish that was never cured properly. A survey is what separates a door that works from one you fight with.
Price and lead time in West Midlands
Timber Front Doors start at £1,350 per door supplied and fitted, VAT included, with a typical lead time of 6–8 weeks. Try the indicative price tool for a range, or send sizes and we will be closer.
Common questions
Should a front door open in or out?
Almost always inwards in the UK, so the weatherbar and the rebate can shed water outwards and the hinges are protected from the elements.
What door suits a Victorian terrace?
A four-panel door with a bolection moulding and an etched or obscured upper light. Stile widths matter — narrow modern stiles make the proportions look wrong immediately.
What finish options are there?
Factory spray in any RAL or heritage colour, translucent stains, and natural oils on oak. All applied and cured in controlled conditions before the door ships.
Do you remove the old door?
Yes, and we take it away. If the frame is sound we can hang into it; if it has rotted at the foot we will say so at survey rather than after.
Can you supply just the door leaf?
Yes, if the existing frame is sound and correctly sized. We will check it at survey — hanging a new leaf in a failed frame wastes the door.
How much does a timber door cost?
Guide prices start from the figures shown on each product page, supplied and fitted. The variables are size, timber, glazing and ironmongery, and the survey fixes the number.
Timber Front Doors town by town
Specification changes with exposure and housing character — each town page says how.
Other doors in West Midlands
Get a fixed price for West Midlands
Send sizes or a photograph and we will come back with an indicative range, then survey free of charge before anything is made.